The Herefordshire and Gloucestershire Canal (sometimes known as the Hereford and Gloucester Canal) is a canal in the west of England, which ran from Hereford, the county town of Herefordshire to Gloucester the county town of Gloucestershire, where it linked to the River Severn. It was opened in two phases in 1798 and 1845, and closed in 1881, when the southern section was used for the course of the Gloucester to Ledbury Railway. It is currently the subject of an active restoration scheme.
The first plans for a canal between Hereford and Gloucester were made by Robert Whitworth, one of James Brindley's pupils, in 1777. The route was part of a grander plan to link Stourport on Severn and Leominster as well. Twelve years later, Richard Hall submitted plans for a canal via Ledbury. The route was revised to pass to the west of Ledbury, rather than to the east, and with Josiah Clowes as engineer, parliamentary approval was sought. An Act of Parliament was obtained in April 1791. Hugh Henshall, who was the brother-in-law of James Brindley, was asked to re-survey the route in 1792, and recommended a diversion to Newent, where there were minor coalfields. This route required a tunnel at Oxenhall, and another act of parliament was obtained in 1793 to sanction the new route. By 1795, the initial section was open to Newent, but the tunnel was causing major problems.
In order to build the canal, twenty shafts were sunk along its route, so that there could be multiple working faces. However, there were considerable difficulties caused by the volume of water entering the shafts. Horse-powered pumps proved inadequate, and eventually steam-powered pumps were employed, but this added to the cost, and the tunnel was a large factor in the failure to complete the canal.
The canal was opened to within one mile of Ledbury in 1798, but stopped there as the cost had far exceeded the estimates. Ledbury remained the terminus for another forty years, although a short extension to enable coal to be delivered to the Ledbury gas works was completed in 1832. The Coal Branch to the mines at Newent was never a success, as the coal was of very poor quality, and the branch fell into disuse very quickly.
The canal had cost far more to build than was originally planned. The whole canal had been estimated at £69,997 by Josiah Clowes in 1790, but the section to Ledbury had cost in excess of £104,000. Stephen Ballard had estimated the cost of the second phase at £53,000, but the final cost had been £141,436. With little increase in trade from the longer canal, the company tried to sell it to a railway company almost immediately, but were unsuccessful, and so tried to boost trade.
Traffic started to increase, to the extent that a timetable for the transit of the Oxenhall tunnel had to be introduced in 1849. This was not always successful, as the Hereford Times carried articles in May 1851 about an incident in which boats travelling in opposite directions had met in the middle, and neither would give way. There was deadlock for a period of 58 hours.
In 1858, the canal carried 47,560 tons of goods, and generated an income of £7,061 in 1860, but some of this was derived from the carriage of materials to build railways in the area. On 17 January 1862, less than 17 years after the opening to Hereford, the canal was leased to the Great Western and West Midland Railways, with a view to converting it to a railway. This did not take place immediately, but on 30 June 1881, half of the canal was closed , and sections of it were used for the course of the Ledbury to Gloucester railway. The Hereford to Ledbury section remained open, but gradually became disused. The Canal Company continued to receive rent from the Great Western Railway, and was not formally wound up until the railways were nationalised in 1948.
In 1858, the canal carried 47,560 tons of goods, and generated an income of £7,061 in 1860, but some of this was derived from the carriage of materials to build railways in the area. On 17 January 1862, less than 17 years after the opening to Hereford, the canal was leased to the Great Western and West Midland Railways, with a view to converting it to a railway. This did not take place immediately, but on 30 June 1881, half of the canal was closed, and sections of it were used for the course of the Ledbury to Gloucester railway. The Hereford to Ledbury section remained open, but gradually became disused. The Canal Company continued to receive rent from the Great Western Railway, and was not formally wound up until the railways were nationalised in 1948.
The canal is now undergoing restoration by the Herefordshire and Gloucestershire Canal Trust (Herefordshire and Gloucestershire Canal Trust). Since 1983 the Trust has pursued its aim to fully restore the 34 miles (54 km) of canal and locks which will once again link Hereford with Ledbury, Dymock, Newent and the rest of the inland waterway system at Gloucester.
Since 1991 the local council authorities in Herefordshire have set aside land for development as a canal route. The planning department has approved projects with the canal in mind, and has taken action against those trying to build on the proposed route of the canal. Similar support has been given by the local council authorities in Gloucestershire. In 2000, the Over Canal Basin (adjacent to the River Severn on the outskirts of Gloucester, where the Canal links with the inland waterways network) was reconstructed entirely by volunteers from the Canal Trust and the national volunteer body the Waterway Recovery Group. Some £500,000 of work was undertaken, against a 10 month deadline, with a budget of just £60,000.
Major re-development in Hereford town centre has resulted in the construction of a new canal bed which will eventually link to a new basin, to form the centrepiece of the Edgar Street Grid development. Further development of the Aylestone Park section is also taking place, following the removal of silt containing heavy metals.